Sign Permit Expeditor – Let our team handle the permit process for you.
Dollar Sign works as your sign permit expeditor on Long Island, so you are not the one chasing paperwork at town hall. We find out what your town or village requires, prepare the drawings and specs for the application, and follow up with the building department. Once your permit is approved, we build and install the sign.
We coordinate the paperwork with your town or village
We review your landlord's sign criteria before anything is filed
Permit-ready drawings and specs from our design team
Installation by our crew once the permit is approved
Mon to Fri, 9am to 5pm. Saturday by appointment.
How It Works
How Our Sign Permit Service Works
Sign permits on Long Island are handled town by town and village by village. You tell us about the sign, and we take the permit work off your plate from the first call to the final install.
- 1
Share Your Project and Location
Send us the sign you have in mind, the property address, and the town or village it falls under. Photos of the building and any landlord sign rules you have help us get started.
- 2
We Handle the Research and Filings
We check what your town or village building department requires, review your landlord's sign criteria, and prepare the application with drawings and specs from our design team. Then we file it and follow up.
- 3
We Fabricate and Install Once Approved
When the permit comes through, we build your sign in our Farmingdale shop and our installers put it up. The sign that goes on your building matches the drawings the town reviewed.
What We Handle
The Permit Work We Take On
You should not have to learn the permit process just to put up a sign. We handle it as part of our sign work and ask the right questions before an application goes in.
Every town and village makes its own permit decisions on its own schedule. We prepare a complete application and stay on it, but we cannot promise approval or a set timeline.
Permit Research With the Building Department
We contact your local building department to learn which permits, forms, and documents your sign needs. Size limits, placement rules, and paperwork change from one municipality to the next.
Sign Drawings and Specifications
Our design team prepares the drawings the application calls for, with sign dimensions, materials, and placement on the building, so the reviewer sees exactly what will be installed.
Landlord and Property Manager Sign Criteria
Many shopping centers and commercial buildings set their own rules for sign size, color, and lighting. We review those criteria and get the design in line with them before it goes to the town.
Electrical Sign Requirements
Lighted signs, such as storefront channel letters and cabinet signs, need power at the wall. We coordinate the electrical requirements for the application with a licensed electrician.
Follow-Up Until Approval
We track the application, answer the building department's questions, and revise the drawings if they ask for changes. You get updates from us instead of making the calls yourself.
Built in FarmingdaleWhy Dollar Sign
One Shop for the Permit and the Sign
Dollar Sign has designed, fabricated, and installed signs for Long Island businesses since 2016, all from our shop at 1021 Fulton St in Farmingdale. The same team that draws your sign for the permit application also builds it and installs it.
That keeps the handoffs short. If the town asks for a change, our designers update the drawings in house. Browse our sign services or see finished work in the project gallery.
Rated 4.9 by Long Island businesses
Trusted by 500+ Long Island businesses with a 4.9-star Google rating.
FAQs
Sign Permit Questions
Straight answers about permits for business signs in Nassau County and Suffolk County. See the areas we serve, or contact our team with a question about your project.
Do I need a permit for my business sign on Long Island?
In most cases, yes. Most towns and villages on Long Island require a permit for a new exterior business sign, and some also review sign replacements and window signs. The rules vary by town or village, so we confirm what your municipality requires before anything goes into production.
How long does the sign permit process take?
It depends on the municipality. Each town or village sets its own review schedule, and some projects need extra steps, such as landlord approval or an additional board review. We keep you updated from filing until the town or village makes its decision.
Can you install the sign after the permit is approved?
Yes. We design, fabricate, and install signs ourselves, so once your permit is approved we schedule the installation with our crew.
What do you need from me to get started?
The sign location address, the town or village, the type of sign you want, and a short description of the project. Photos of the building, drawings, or your landlord's sign criteria help too, and you can upload them with the form on this page.
Hand Off Your Sign Permit to Our Team
Send us your sign location and project details, and we will start the permit research for your town or village.
